Low Temperature & Energy Saving Powder Coating Series
We can supply low temperature and energy saving powder coatings which can solidify at 160 ℃in 15 minutes, or 190℃ in 3 minutes. This powder can save 30% energy and increase production efficiency by 50%.
Application restrictions:
Be applicable to all high gloss or half gloss products.
Surface texture
We can offer powder coatings which can work our different colors. Physical properties gravity is 1.4-1.7 up to color and gloss. Grit size 100% smaller than 100μm, special requirement should be informed in advance.
Application condition:
Consolidation conditions standard in 180℃ of work pieces' temperature can finish in 15-20 minutes.
Pre-treating low temperature is 160℃ of work pieces' temperature can finish in 15 minutes. Fast way is 200℃ of work pieces' temperature can finish in 3 minutes.
Pre-treating methods differ from different substrates (phosphate process, sand blasting, shot treatment)
Spraying Way: Corona electrostatic spraying and frictional electrostatic spraying.
Other special spraying method, client must propose requirement ahead.
Theoretical coverage 8-10 m2/kg,
Suggested layer thickness is 60μm.